Campaign & Delivery Timeline
Most late crowdfunding games aren't late because of one disaster. They're late because nobody planned for Chinese New Year, the second proof round, six weeks at sea and customs. Plan all of it here and get a delivery month you can keep.
02Timeline
Lead times, transit ranges and payout days are indicative planning values for games made in China, not quotes. Confirm dates with your factory, freight forwarder and fulfilment partner.
03Backer-facing text
04Backer updates
When to post. Tick what you've posted; it's saved with this plan.
05Phases PRO
Make it your plan. With Pro you can change any duration, link phases differently, add your own phases and shipping waves, and enter actual dates to re-forecast everything downstream.
| Phase | Starts after | Offset | Days | Holidays | Start | End | Actual start | Actual end | Remove |
|---|
Offset moves a phase later (or earlier, negative) than its dependencies. Days count factory working days when Holidays is ticked. Actual dates replace the plan for that phase, and everything after it is re-forecast; the original plan shows as a dashed outline.
06Saved plans PRO
Basic keeps one plan in this browser. Pro keeps as many as you like and moves them between computers as a JSON file.
Shipping to backers in the EU, UK and US? Hexy Studio handles freight from the factory, customs and fulfilment from our Polish hub, so your timeline has one partner instead of four.
See Hexy fulfilmentBasic: generated plan with Chinese New Year, Golden Week, proofs and freight, PNG and print, estimated-delivery text · Pro: editable phases and dependencies, shipping waves, calendar (ICS) export, plan vs actual, several saved plans · Compare plans
From launch day to the backer's door
Describe the campaign
Launch date, length, platform, how ready your files are and how complex the game is. Those drive payout, pledge manager, proofs and the factory lead time.
We chain the phases
Each phase starts when the ones it depends on end. Production waits for both sample approval and the pledge manager lock. Factory steps skip Chinese New Year and Golden Week.
Promise the safe month
Earliest uses the fast end of every range, likely the typical one, and safe the slow end plus your risk buffer. Put the safe month on your reward tiers.
Tips that save months
- Freeze files before the factory's holiday, not after. A proof sent in mid-January can sit untouched until March.
- Keep the pledge manager short. Four to six weeks is enough for most campaigns; production can't start without final numbers.
- Budget a second proof round. Colour, card stock and insert fit rarely pass the first time, and miniatures almost never do.
- Post monthly, even with no news. Silence is what turns a delay into a refund wave.
Run the plan, not just draw it.
Pro comes with Hexy Tools Pro (all tools), monthly or yearly, cancel any time, or with the Campaign pass: 3 months, one payment.
$99 / year or $10 / month
Already have Pro? with your Hexy account.
- Editable phasesChange any duration, offset or dependency, and add your own phases such as translation or a reprint.
- Shipping wavesShip the core game first and add-ons or retail later, each wave through every hub.
- Plan vs actualEnter real dates as they happen; everything downstream is re-forecast against the original plan.
- Calendar exportEvery phase and milestone as an ICS file for Google Calendar, Outlook or Apple Calendar.
- Several plansCompare a March and a September launch side by side, and save or load plans as JSON.
Questions about delivery dates
How long after a Kickstarter campaign do board games usually ship?
For a standard boxed game made in China with files ready at launch, plan on about 7–10 months from the end of the campaign to delivery: about 2 months of pledge manager and proofs, 2–3 months of samples and mass production, 1.5–2 months of ocean freight and customs, and 3–6 weeks of fulfilment. Miniatures-heavy games and unfinished art add months.
How does Chinese New Year affect board game production?
Most Chinese factories close for about two weeks before and three weeks after the Lunar New Year, and workers return slowly. Any step that needs the factory (proofs, samples, production, QC, trucking to port) stops for those weeks, so a plan that crosses January or February can lose five weeks or more. The tool shades these windows and pushes affected phases automatically.
Which delivery month should I put on my campaign page?
Use the safe month, not the likely one. The safe date takes the slow end of every range (proofs, freight, customs, fulfilment) and adds your risk buffer. Backers forgive a game that arrives early far more easily than one that misses its date.
Is sea freight or air freight better for a crowdfunding game?
Sea freight is the norm: a full container (FCL) costs a fraction of air and takes about 5–8 weeks door to door to Europe or the US. A shared container (LCL) suits small runs but adds 1–3 weeks for consolidation. Rail to Europe takes 3–5 weeks. Air is 1–2 weeks but usually only makes sense for samples, reviewer copies or a small first wave.
Why does production wait for the pledge manager to close?
The factory needs final quantities of the game and every add-on before it starts mass production. A long pledge manager therefore delays the whole chain. Shortening it, or ordering a buffer quantity based on early pledge manager data, brings delivery forward.
Is my plan stored anywhere?
No. Your plan is saved in your browser only. Nothing is uploaded. Pro lets you export plans as a JSON file to move them between computers.