Send the spec to the factory and revise it

Submit an RFQ with a message, understand frozen versions (v1, v2…), and send a revised RFQ after changes.

QuoteFor publishers#rfq#versions#publisher#quoteUpdated

Included inFree, Start, Pro, Scale, Private

An RFQ (request for quote) sends a frozen copy of your spec to the factory. You can keep working on the project. When it changes, you send a revised RFQ as a new version.

Before you start

  • You are the project owner or an editor. Viewers cannot send.
  • Your e-mail address is confirmed (the link in the sign-up e-mail).
  • The project has a game name, at least one component and at least one quantity, and no spec-check errors. See Understand live spec checks.

Send the first RFQ

  1. In the project editor, click Request quote (top right). The button is grey while the project has no components.
  2. The window Send spec to the factory opens. It shows the number of Components, SKUs and the Quantities.
  3. If something blocks sending, you see Missing: … or Fix these first with the errors. Close the window, fix them and try again.
  4. Warnings are listed under "N warnings — you can still send". Open the list to read them.
  5. Type a Message to the factory (optional), for example "Target retail price, sampling needs, questions about materials…".
  6. Click Send request.
The Send spec to the factory window with a note typed
The Send spec to the factory window with a note typed

You see "RFQ sent — you'll be notified when the factory replies" and the Quotes tab opens. The RFQ is listed as v1 with the status In quoting. The factory is notified and gets an e-mail.

What "frozen" means

"A frozen copy of this spec is sent." The factory sees the spec exactly as it was when you clicked Send request: components, SKUs, quantities, delivery terms and notes. Changes you make afterwards are not visible to the factory until you send a revised RFQ.

The header of the editor shows Spec v1 sent and the date.

Send a revised RFQ

  1. Change the spec: add or remove components, change sizes, quantities or delivery terms.
  2. The Quotes tab shows, under each earlier version, "N changes in your spec since this request". Open it to see what changed (added, removed and modified components, quantities).
  3. Click Send revised RFQ (the same button, renamed after the first RFQ).
  4. Add a message about what changed, and click Send request.

The new version (v2, v3…) gets its own card on the Quotes tab and its own row in the factory's inbox. Older versions and their quotes stay for reference.

The list of changes since an earlier request on the Quotes tab
The list of changes since an earlier request on the Quotes tab

Limits

  • At most 5 RFQs in 10 minutes and 30 per day per account. This protects the factory from accidental floods.
  • An archived project cannot be sent. Restore it first. See Create and manage game projects.

In the demo

The RFQ goes to the demo factory: "RFQ sent to the demo factory — open the Factory inbox to reply as the factory". See Try the live demo.

What happens next

The factory can mark the RFQ In review, send a quote or decline. See RFQ and quote statuses explained and Compare and accept quotes.

Something wrong on this page? Write to studio@hexy.studio.