Sculpt statuses and approvals

In progress, Needs review, Changes requested, Approved — who sets each status in Sculptor and where it shows in Hexy Spec.

SculptFor publishers and factories#status#approval#versions#commentsUpdated

Included inScale, Private·Add-onStart, Pro

Each sculpt has a review status in Hexy Sculptor. The status and the number of open comments are shown back in Hexy Spec, so nobody has to open every model to see where things stand.

Before you start

The statuses

StatusMeaning
In progressThe sculpt is still being worked on
Needs reviewA version is ready to look at
Changes requestedThe reviewer wants changes; see the comments
ApprovedThe current version is accepted

Who sets the status

  • Publisher (reviewer): in the Sculptor top bar, click Request changes or Approve v2 (the current version number).
  • Factory: use the Status menu in the Sculptor top bar to pick any status.

In the demo, the Comment as: Publisher / Factory switch changes who posts comments.

Miniatures section of an RFQ showing each sculpt's status, version and open comments
Miniatures section of an RFQ showing each sculpt's status, version and open comments

Where you see it in Hexy Spec

  • Publisher: the sculpt table on the Components tab shows the status badge, in Sculptor v2 and, for example, 3 open comments.
  • Factory: the Miniatures section of the RFQ shows the thumbnail, size, status, version and 2 open comments, All comments resolved or No comments yet.

Hexy Spec refreshes these when you come back to its browser tab.

A typical round

  1. The publisher imports the STLs and sends the RFQ.
  2. The factory opens each sculpt, pins comments ("undercut on the left arm"), and sets Changes requested.
  3. The publisher's sculptor fixes the model. The publisher drops the new STL with the same name. Sculptor gets v2.
  4. Both sides compare v1 and v2, resolve the comments and set Approved.

Something wrong on this page? Write to studio@hexy.studio.