How the factory price list works
How your price list prices every spec and quote: 21 groups, about 90 price rows, print-run tiers, per-run and one-off costs.
Included inStart, Pro, Scale, Private
The price list holds your own prices for every component and print run. Hexy Spec uses the active version for two things: the automatic price publishers see while they build, and the Fill from price list button in your quote form.
Before you start
- You need a factory account and the Pricebook module.
- Open Factory inbox → Price list (open in the app).

The page at a glance
From top to bottom:
- Version selector and a badge: Active, Inactive or Not saved.
- A toolbar: Fill from Hexy model, Import CSV / XLSX, Export XLSX, CSV, Duplicate as new version, Delete version, then Revert, Save and Activate.
- Settings of this version: Name, Currency, Valid from, Between quantity breaks, Print-run tiers (copies) and Notes (internal).
- Check — the price of the built-in sample game (Orbital Outpost, 14 components, 2 SKUs) per run, with columns This table, Saved and Hexy model. Use it to see the effect of your changes.
- The price table.
The price table
The table has 21 groups, for example Printing plates & make-ready, Cards, Rigid boxes, Rulebooks & booklets, Punchboards, tokens, standees & dials, Dice, Wood pieces, Miniatures, Finishes & effects (surcharges) and Assembly, QC & packing. Under each group name you see which component types use it.
There are about 90 price rows of three kinds:
| Kind | Where you type it | Example |
|---|---|---|
| Per tier | One price per print-run column | Price per card at 1,000 / 2,000 / 3,000 / 5,000 / 10,000 copies |
| Per run | The Per run / one-off column | Make-ready for one print run |
| One-off | The Per run / one-off column | Cutting dies, moulds (tooling) |
Tick Show technical factors to see a few more rows (factors) that tune the calculation. They are hidden by default.
Print-run tiers and in-between quantities
The default tiers are 1k / 2k / 3k / 5k / 10k copies. Add a tier in Add run, e.g. 1500, or remove one with its ×.
A publisher may ask for a quantity between your tiers, for example 2,500. Between quantity breaks decides the price:
- Smooth — "Price eases between breaks."
- Step — "A run uses the price of the highest break it reaches."
How a price is built
For each component in the spec, Hexy Spec takes the matching rows (material, size, print, finishes, plates, make-ready, assembly), converts them to a price per game copy for each requested quantity, and adds tooling separately. The result is:
- for publishers: price per copy, total per print run and one-off tooling, labelled Factory price list (valid from …);
- for you: tier prices, tooling and an editable per-component breakdown in the quote form.
Editing tips
- Click a cell and type. Enter or ↑ ↓ move between rows, Esc restores a cell. Values are shown to 4 decimals.
- Find a component or price… filters the rows.
- Mark prices that differ from the Hexy model highlights your own prices.
- Unsaved edits stay in this browser session. If you leave the page, the app asks first.
Something wrong on this page? Write to studio@hexy.studio.