Factory quick start: answer your first RFQ
Open the RFQ inbox, read the spec, fill the quote (from your price list if you have one) and send it.
Included inFree, Start, Pro, Scale, Private
This guide takes you from a new RFQ to a sent quote. You can try every step in the live demo, where you are the publisher and the factory at once.
Before you start
- You need a factory account. Hexy Studio adds factory accounts for your portal. See Factory staff accounts.
- Optional, with Pricebook: an active price list. Without it you type prices by hand. See How the factory price list works.
1. Open the RFQ inbox
- Sign in and click Factory inbox in the header.
- The RFQ inbox opens. The tiles at the top count New, In review, Quoted and Accepted requests. Click a tile to filter.
- Click a row with the status New.

2. Read the spec
The RFQ page shows the spec exactly as the publisher sent it, frozen as that version:
- Message from publisher (if they wrote one)
- Game, SKUs & quantities with the quote tiers
- The spec tables: every component with quantity per game, size, material, print, finish, features, notes and SKU scope
- Logistics & compliance: Incoterm, destination, shrink wrap, master carton, target date, certifications, FSC paper
Click Mark in review to tell the publisher you are working on it. Click Download spec PDF if you want a printable copy. See Read an RFQ.

3. Fill the quote
The Quote form is on the right.
- Pick the currency (USD, EUR or PLN) at the top of the form.
- With Pricebook: click Fill from price list. Tier prices, tooling and a per-component breakdown fill in. Adjust what you need. See Fill a quote from the price list.
- Without a price list: type a Unit price for every print run.
- Type Tooling / one-off (dies, moulds, plates).
- Set Lead time (days): Proofing, Production, Shipping. The timeline shows the ready ex-works date. A warning appears if it is later than the publisher's target date.
- Check Valid until and add Notes for the publisher.

4. Send it
Click Send quote. The button stays grey until every print run has a unit price and Production has a number of days.
The publisher gets a notification and an e-mail. The RFQ status changes to Quoted. If the publisher accepts, the status changes to Accepted and you are notified.
Next steps
- Work the RFQ inbox: filters, search and revised versions.
- RFQ and quote statuses explained.
- Generate a price list from the model so your next quotes take one click.
Something wrong on this page? Write to studio@hexy.studio.