Factory quick start: answer your first RFQ

Open the RFQ inbox, read the spec, fill the quote (from your price list if you have one) and send it.

QuoteFor factorys#factory#first-steps#rfq#quoteUpdated

Included inFree, Start, Pro, Scale, Private

This guide takes you from a new RFQ to a sent quote. You can try every step in the live demo, where you are the publisher and the factory at once.

Before you start

1. Open the RFQ inbox

  1. Sign in and click Factory inbox in the header.
  2. The RFQ inbox opens. The tiles at the top count New, In review, Quoted and Accepted requests. Click a tile to filter.
  3. Click a row with the status New.
The RFQ inbox with status tiles, filter chips and the RFQ table
The RFQ inbox with status tiles, filter chips and the RFQ table

2. Read the spec

The RFQ page shows the spec exactly as the publisher sent it, frozen as that version:

  • Message from publisher (if they wrote one)
  • Game, SKUs & quantities with the quote tiers
  • The spec tables: every component with quantity per game, size, material, print, finish, features, notes and SKU scope
  • Logistics & compliance: Incoterm, destination, shrink wrap, master carton, target date, certifications, FSC paper

Click Mark in review to tell the publisher you are working on it. Click Download spec PDF if you want a printable copy. See Read an RFQ.

Top of the RFQ page with the game, SKUs, spec tables and logistics
Top of the RFQ page with the game, SKUs, spec tables and logistics

3. Fill the quote

The Quote form is on the right.

  1. Pick the currency (USD, EUR or PLN) at the top of the form.
  2. With Pricebook: click Fill from price list. Tier prices, tooling and a per-component breakdown fill in. Adjust what you need. See Fill a quote from the price list.
  3. Without a price list: type a Unit price for every print run.
  4. Type Tooling / one-off (dies, moulds, plates).
  5. Set Lead time (days): Proofing, Production, Shipping. The timeline shows the ready ex-works date. A warning appears if it is later than the publisher's target date.
  6. Check Valid until and add Notes for the publisher.
Quote form filled from the price list, with the per-component breakdown open
Quote form filled from the price list, with the per-component breakdown open

4. Send it

Click Send quote. The button stays grey until every print run has a unit price and Production has a number of days.

The publisher gets a notification and an e-mail. The RFQ status changes to Quoted. If the publisher accepts, the status changes to Accepted and you are notified.

Next steps

Try it in the live demo

Something wrong on this page? Write to studio@hexy.studio.